Apartheid Wall
Is the Wall temporary?
At the cost of 12 million NIS or 2.8 million USD per km, the Wall is not a “temporary” measure but the continuation of Israel’s theft of Palestinian land and iron grip of Palestinian resources. The Wall, through its path which is marked by land annexation and destruction, is clearly a “tool” for the Israeli government in maximizing the confiscation of Palestinian land for future settlement expansion. In one case, in the village Nazlat ‘Isa, located between the Wall and the Green Line, the Wall brought the complete destruction of the entire village market including over 200 shops and five homes (with...
When is the build of the wall scheduled to be completed.
The Israeli government began building the Wall in June 2002 in the northern West Bank districts of Jenin, Tulkarem, and Qalqiliya; at the end of July 2003, Israel announced the “completion” of this section, the so-called “first phase”, which stretches some 145 km (90 miles). However, the Israeli government continues to raze land, destroy shops, homes, and infrastructure in these areas as well as pave way for the “buffer zone”. Simultaneously, destruction for and building of the Wall has been taking place in northern Jerusalem by Qalandiya and Kafr Aqab, in the neighborhood Abu Dis in eastern Jerusalem, and around Bethlehem,...
What does the Wall look like?
The Wall takes on a variety of forms; around Qalqiliya the Wall is pure concrete eight meters (25 feet) high and fortified with armed watchtowers and in other areas it may be part concrete/part fence or a series of razor wire and/or electric fencing all of which includes a 70-100 meter (approximately 230-330 feet) “buffer zone” with trenches, roads, razor wire, cameras, and trace paths for footprints. In Bethlehem and Jerusalem, the Wall is made up of a combination of these edifices. Regardless of the Wall’s structural differences, the implications are the same for Palestinians– the inability to travel for...
Where is the Wall being built?
The Wall is being built deep within the West Bank as it zigzags throughout 10 out of the 11 West Bank districts. The Wall, on this path, de facto annexes nearly 50% of the West Bank and completely destroys all continuity of life in the region. The Wall begins at the northern most point in the West Bank and runs through the western districts of the West Bank to the north of Jerusalem; the Wall is not being built on or near the 1967 Green Line and at points reaches 16 km (some 10 miles) deep right into the heart of the...
How long is the Wall?
In total the Wall will run over 650 km (400 miles) inside the West Bank....
< 1 2

Current Articles

The Latest News

Archives

Latest Tweets

  • The RSS feed for this twitter account is not loadable for the moment.

Follow @freepali on twitter.